Today I want to focus on the construction of artificial turf. In many projects the old turf should be removed first.
Then the black ground is going to be leveled so there is a stable base for the artificial turf. The next step involves the application of a layer of sand. The type of sand is also known paving sand.
The layer should be between 5 and 6 inches thick. Below a picture of the construction of the sand.
The next step consists levelling the sand so the artificial turf is formed into the substrate. When these operations are carried out, a geovlies / stabilization fabric should be constructed. This prevents roots / weeds coming through the artificial turf.
The next step is to roll out the turf and the folds need to be straightened. For customizing the grass, you can use a hook knife to cut the artifical grass into applicable pieces. Finally, don't forget to brush the artifical grass with a brush machine. This gives you the best result.
Of course you can also outsource the above process to a proffesional company. I have also made this decision and i'm very happy with the result.